The installation of the SRV45 system must be carried out carefully to ensure proper operation, user safety and optimal performance. Follow the steps below carefully for a successful installation.


1.Choose the duct location: Select an exterior wall and mark a spot at a height of 6 feet (72 in) from the ground.


2.Drill the duct hole: Use a suitable drill bit to drill a 6ΒΌ" circular hole through the exterior wall. Before drilling, ensure there are no electrical wires or hidden utilities behind the chosen area.


3.Insert the duct: Insert the provided ventilation duct into the wall opening, ensuring a snug and airtight fit.


4.Secure the SRV45 unit to the interior wall:


o Mark the screw hole positions.

o Drill the holes and insert wall plugs if needed.

o Attach the SRV45 unit to the wall using the provided screws.

o Connect the unit directly to the mains power supply (120V AC).


5.Final check: Ensure the unit is firmly mounted, the duct is properly inserted and sealed, and the system is stable and secure.


Installing the Exterior Vent grille


-Positioning: Once the ventilation duct has been inserted through the wall, place the exterior grille at the outer end of the duct, on the exterior wall side.


-Applying a Sealant (recommended) : Apply a bead of silicone sealant around the inner edge of the grille to ensure a tight air- and water-proof seal between the grille and the wall surface.


-Mounting: Secure the grille to the wall using the provided screws , or use screws suitable for your wall type (bricks, rendering, etc.). Ensure that the grille is firmly flush against the wall to prevent any air or water infiltration